Freedom Boatworks, LLC completed construction of hull #1 on May 16,2008.  Our boats are built upside down on a Male “JIG”.  When complete, we bring in a crane and flip the boat upright.  Our crew then starts work on the inside of the boat.  Applied Concepts supplied us with a superior jig surface to work from and our skilled staff finished the boat in a record breaking 47 days.  Jim Polatty said, “the quality and build time on this boat far surpassed that of the 19 previous cold molded boats that he had worked on.”